Your present position: Home > News > KRC News
Ministry of Petroleum Urges for Hurrying UP Seismic Surveys [2013.07.29]
Dr. Al-Jaz gives directive for speeding up work to keep pace with information era [2013.06.06]
Taha Inaugurates Fuel Storage Facilities in Gedarif [2013.06.06]
Russia expresses desire to invest in oil and gas industry in Sudan [2013.05.22]
Export of S. Sudan's Oil via Sudan to Resume by 20 April; Ministry [2013.03.31]
Petroleum Ministry Seeks Increase Chinese Oil Investments [2013.03.28]
Preparations Finalized to Establish Bejrawiya Oil [2013.03.20]
Al Jaz Urges Oil Companies Accelerate Efforts [2013.02.14]
Oil Ministry, Saudi Company Discuss Exploration [2013.02.06]
Minister: Oil production Reaches 140,000 bpd [2013.01.29]
Minister: Preparations Finalized to Establish Bejrawiya Oil and Gas Spare-parts Fa.. [2013.01.29]
Hadida Oil Field Represents Major Boost for the Sudanese Economy [2012.12.31]
Pagan Amum : Khartoum, Juba Agree on Resuming Pumping Oil [2012.12.04]
Al Jaz Receives First Sample of Al Najma Oil Field [2012.11.26]
Minister of Oil meets UAE Ambassador in Khartoum [2012.11.26]
AL Jaz: Sudan Ready to Receive Southern Oil Based on Cooperation Deal [2012.11.19]
Ten Blocks to Begin Producing Oil in 2013 [2012.11.19]
Dr. Awad Ahmed al-Jaz Visit to the Refinery [2012.11.14]
Government and China to Discuss Restart Pumping [2012.11.12]
Khartoum & Juba Decide to Restart Pumping Southern Crude Oil [2012.11.07]
Japanese Ambassador Visit's KRC [2011.10.05]
MOP Minister Visit [2011.09.15]
KRC Is 11 Years Old! [2011.05.16]
Refining in Africa [2011.05.11]
Sudan Agricultural Experts Visit KRC(Photo News) [2011.05.04]
The site glimpses in KRC overhaul times (F) [2011.05.04]
The site glimpses in KRC overhaul times (E) [2011.05.04]
The site glimpses in KRC overhaul times (D) [2011.05.03]
The site glimpses in KRC overhaul times (C) [2011.05.03]
Great Success –Eight Days ahead of Work Schedule [2011.04.28]
The site glimpses in KRC overhaul times (B) [2011.04.12]
The site glimpses in KRC overhaul times (A) [2011.04.12]
RFCC Completes the Overhaul Tasks [2011.04.11]
Inspection of the State Minister of Ministry of Petroleum of Sudan on KRC’s overh.. [2011.04.11]
South Korea announces Desire to Invest in Sudan oil [2011.04.10]
Ministry of Oil announces measures for guaranteeing flow of petroleum products in .. [2011.03.23]
We Expect a Production of 200,000 bpd in the North in 2012': Minister [2011.03.21]
14th Board of Directors Meeting Completed in Sanya City [2011.03.20]
Oil Minister Meets Directors of Oil Companies [2011.03.15]
Sudan oil production to increase to 195,000 bpd by the end of 2012 [2011.03.01]
A total of 58 messages Previous 1 [2] Next Page 1/2 Total 2